Asbestos Survey of Warehouse Building in Hull

Hing Long Hong Asbestos Management Survey Case Study

Hing Long Hong, a leading Chinese food wholesaler, was recently visited by the Health and Safety Executive (HSE). During this visit, the absence of an asbestos management plan was highlighted as a significant compliance gap. Concerned about the potential risks, Hing Long Hong engaged Complete Asbestos Surveys to conduct a thorough asbestos management survey.


Survey Details

The property included several distinct areas:

  • A large warehouse
  • Ground floor retail space
  • Fridge and freezer units
  • First-floor offices

Complete Asbestos Surveys inspected all areas meticulously, focusing especially on the warehouse, where the construction materials raised particular concerns.


Findings

The survey identified asbestos-containing materials (ACMs) in multiple parts of the property, including:

  • Cement asbestos roof and wall sheets in the warehouse
  • Asbestos cement gutters
  • Asbestos cement rainwater downpipes

While most materials were in good condition, two rainwater downpipes exhibited damage. These damaged areas posed a potential risk, particularly in a busy environment like a warehouse.


Recommendations

To address the findings, Complete Asbestos Surveys made the following recommendations:

  1. Encapsulation of Damaged Downpipes
    • The damaged rainwater downpipes were encapsulated to prevent further deterioration and ensure safety for employees and visitors.
  2. Implementation of an Asbestos Management Plan
    • A robust asbestos management plan was developed to monitor all ACMs, including the roof, wall sheets, gutters, and downpipes.
    • The plan incorporated:
      • Regular inspections
      • Maintenance protocols
      • Employee awareness training

Outcome

After the survey and implementation of the management plan:

  • Hing Long Hong achieved full compliance with HSE regulations.
  • The encapsulation of the damaged downpipes was completed successfully, eliminating the immediate risk without incurring costly removal expenses.
  • The wholesaler can now continue operations with confidence, knowing that asbestos-related risks are proactively managed.

Complete Asbestos Surveys’ comprehensive and proactive approach addressed the immediate concerns and established a long-term asbestos management strategy. Hing Long Hong now operates safely, with measures in place to protect employees, customers, and visitors.

Case Study Overview

Location

Hull

Year

2024

Services Provided

Asbestos management survey

Case Study Gallery


Request a Quote

Get in touch with Complete Asbestos today for a free no obligation quotation on any size asbestos removal or survey project.