Complete Asbestos Surveys were instructed by Harrisons, a building contractor, to carry out an asbestos refurbishment survey at a residential property in Otley, West Yorkshire, ahead of constructing a new rear extension. The survey focused on the downstairs WC and adjoining corridor, where the builders planned to break through the existing structure. Two samples were taken, with laboratory analysis confirming that the floor tiles were negative for asbestos, but the underlying bitumen adhesive contained asbestos. The survey report was delivered within 48 hours, allowing the contractor to plan the necessary removal before proceeding with the affected works.
Case Study Overview
- Provided
- Asbestos Refurbishment Survey
- Client
- Harrisons – Building Contractor
- Location
- Otley
- Year
- 2026
- Duration
- 1 Hour
- Cost
- £320
The Client's Challenge
Harrisons were preparing to construct a new extension at the rear of a residential property in Otley. The planned building works required breaking through part of the existing structure, including areas around the downstairs WC and corridor.
Before disturbing these materials, the contractor needed to establish whether any asbestos-containing materials were present that could affect the refurbishment work.
Older floor coverings and their adhesives can contain asbestos, making it important to investigate both the tiles and the materials beneath them.
Access to the property was arranged through a neighbour, who was able to let our surveyor in and allow the inspection to proceed.
Our Approach
We attended the property to carry out a targeted asbestos refurbishment survey, concentrating on the downstairs WC and corridor where the new extension would connect to the existing house.
During the inspection, floor tiles and the associated bitumen adhesive were identified as materials requiring further investigation.
Two samples were collected and submitted for laboratory analysis.
The results confirmed:
-
Floor tiles: No asbestos detected.
-
Bitumen adhesive: Asbestos detected.
Although the floor tiles themselves were negative, the positive result from the adhesive beneath them was an important finding for the contractor.
The survey was completed within one hour, and the full refurbishment survey report was issued within 48 hours.
2
Samples taken
1
Negative result
1
Positive result
48 hrs
Report turnaround
£320
Survey cost
Positive Outcome
Harrisons received a detailed asbestos refurbishment survey report identifying the asbestos-containing bitumen adhesive within the area affected by the planned extension.
With the findings confirmed, the contractor could make informed decisions about the next stage of the building work rather than risk disturbing the adhesive without suitable precautions.
We also assisted the client with obtaining quotations for the removal of the asbestos-containing adhesive before the affected refurbishment works proceeded.
The project demonstrates why asbestos refurbishment surveys should investigate materials beneath existing floor coverings, as the tiles themselves may be asbestos-free while the adhesive underneath contains asbestos.
For £320, Harrisons received the information needed to plan the extension works safely, with the survey completed in one hour and the report delivered within 48 hours.